Quick MILL MILANO 0980 Operating Instructions Manual page 55

Professional home coffee machines
Hide thumbs Also See for MILANO 0980:
Table of Contents

Advertisement

Legend:
Ita
a.
Coffee brew group
lia
b.
Coffee delivery lever
no
c.
Filter holder
d.
Steam valve
D
e.
Steam wand
eu
f.
Hot water valve
tsc
g.
Hot water wand
h.
Boiler pressure gauge+
h
Pump pressure gauge
i.
Termopid
En
j.
Cup warmer
gli
k.
Water tank
sh
l.
Drip tray
m. General switch ON/OFF
Fr
an
ça
is
B
Commissioning
The 0995 Vetrano 2 Boiler Pid model can be supplied either with water coming
from the tank or from the water mains, According to the type of supply, proceed
as follows.
Tank
-
Position the tank/service tap (t), underneath the machine, on tank.
-
Position the tank/service switch (u) on tank.
-
Fill the water tank (k) (use drinking water, softened if possible).
S
l x h x p
IZE
W
:
EIGHT
V
:
OLTAGE
P
220/230
:
OWER
V
P
115
:
OWER
V
T
:
ANK CAPACITY
OILER COFFEE CAPACITY
S
TEAM BOILER CAPACITY
T
:
EMPERATURE
n.
Machine ON green light
o.
Coffee heating red light
p.
Steam switch
q.
Steam ON green light
r.
Steam heating red light
s.
Standby/Economy light
t.
Tank/service valve
u.
Tank/service switch (0=tank;1=service)
v.
Direct discharge tank
w. Pump pressure adjustment
x.
Water tank lid
y.
Led switch (if present)
330
– 50/60 H
220/230
V
:
:
55
405
465 mm
X
X
28 K
G
– 60 H
- 115
Z
V
2350 W
2050 W
3
L
0,75
L
1,40
L
+5°C / +45°C
Z

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents