Quick MILL MILANO 0980 Operating Instructions Manual page 56

Professional home coffee machines
Hide thumbs Also See for MILANO 0980:
Table of Contents

Advertisement

Mains water supply:
-
Connect the mains water supply pipe to the fitting under the machine.
-
Position the tank/service tap (t), underneath the machine, on service.
-
Position the tank/service switch (u) on service.
For this machine it is necessary that the water collected in the
drip tray is conveyed to the domestic drainage outlet. For this
reason, it is necessary to connect the drip tray under the machine
(v) directly to the drainage pipe supplied.
1.
Open the water tank lid (x), take out the tank and fill with drinking water,
softened if possible (only for supply with tank).
2.
Connect the machine to an electric socket, switch on the machine with the
general switch (m) and wait for the machine to fill the boiler and reach
working temperature.
3.
Activate the switch of the steam boiler (p) and wait until the heating light (r)
switches offand the working pressure is reached (1,2 Bar).
When used for the first time, with the machine warmed, allow an outlow of
approx.0,5 litres of water to flush the coffee delivery group and hot water to
flush the hydraulic circuit.
For this model, the machine temperature management is by
means of the TermoPID (i). For the management of the
TermoPID see the section "
Coffee brew
1.
Remove the filter holder (c) from its seat, turning it clockwise.
2.
Fill the filter with one or two doses of coffee (according to the filter
inserted).
3.
Press the coffee with the presser.
4.
Place the filter holder (c) to its seat, turning it anti-clockwise.
5.
Place the cups under the corresponding outlets under the filter holder.
6.
Raise the coffee delivery lever (b). after a few seconds, delivery starts.
When the required dose is reached, lower the lever.
P
TERMO
ID SETTING AND FUNCTIONING
56
Ita
lia
no
D
eu
tsc
h
En
gli
sh
Fr
an
ça
is
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents