Step 6: Install Controls; Step 7: Activate Loads In Bypass - Lutron Electronics Grafik Eye GRX-4000 Series Installer's Manual

Installing, operating and maintaining with xp series switching panels
Hide thumbs Also See for Grafik Eye GRX-4000 Series:
Table of Contents

Advertisement

Install Controls and
Activate Loads

STEP 6: Install Controls

After completing steps 4 and 5, mount controls.
Refer to detailed mounting instructions packaged with
each control.

STEP 7: Activate Loads in Bypass

A. Check that the bypass jumpers are in place.
These jumpers protect the switch mechanism from
wiring faults and must be used to check load wiring
when it is installed or modified.
B. Complete load wiring.
C. Turn a load's input circuit breaker ON.
The loads should energize, the feed breaker should
not trip, and total load current must be no more
than 16 Amps.
D. Repeat 'C.' for each circuit with completed load
wiring.
Warning - DO NOT remove bypass
jumpers at this time.
8
Step by Step instructions for GRAFIK Eye
Wallbox
WALLBOX
2 position
Bypass
Jumper
Switching Panel
Control
Control Mounting
CONTROL
CONTROL
LINK
MOUNTING SCREWS
Screws
Link
CONTROL
Control
Faceplate
FACEPLATE
ADAPTER
Adapter
N
N
H
H
Adapter M
ADAPTER
MOUNTING SCREWS
Screws
Facepla
FACEPLATE
1
2
3
4
5
Link
Power
(Pins
Data
(Pins
S
elect
C
ircuit
1
2
Circui
V
V
IE
ALU
S
V
elect
alue
3
4
Valu
S
V
D
elect
alue
isplayed
Load
5
1 Inc/Mag
4 Non-
2
5 Elec.
3
_
Unassigne
Control and Zone
Using circuit
Using Zone
T
Low End
(optional
High End
(optional
Circuit
LUTRO
LUTRO
R
R

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents