11. Figure 8 - Center the front of the Hillside
Divider by measuring from the divider panel
to the point of contact between the shield and
the conveyor on each side. Measurements
should be equal.
12. Figure 9 - Lastly, ensure that the Hillside
Divider panel has proper clearance from the
belt. The bottom edge of the divider panel
should be approximately 3/8" (1cm) from the
rubber belting of a #4 BOC.
13. If adjustments are necessary, loosen the
hardware at the Hillside Divider panel as
required and adjust as necessary. Once
corrected, tighten hardware to proper torque.
14. Figure 10 - Ensure all guards and shields are
securely in place.
15. The spreader is now ready for fi eld testing.