Midland SP-8 Operation, Parts And Service Manual page 50

Road widener
Table of Contents

Advertisement

Model SP-8 &10
With one belt end fully placed along bottom guide
24.
of hopper, top of conveyor belt can be placed into
position on chain wear strip with the help of crane/
suitable lifting device.
Ensure all tools are removed and no debris or
25.
obstruction remains under new conveyor belt.
The ends of conveyor belt must be brought together
26.
at drive roller on discharge end.
With master link of chain open and chain ends
27.
separate, insert orange filler tubes (Y), which are
provided with new conveyor belt splice kit. These
tubes prevent debris from gaining access to hinge
pin and stop it from wearing prematurely.
44
Bring two ends together and insert new conveyor
28.
hinge pin (Z) through overlapping ends. Make sure
that conveyor hinge pin is centered between both
chains
Insert master link (P) on one chain end and Insert
29.
cotter pin (AA) in master link hole. Bend both ends
of cotter pin to avoid master link removal on its own.
www.roadwidener.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spd-8Sp-10Spd-10

Table of Contents