Preparing The Work Space; Installation Of The Support Rails (Only For Table-Top Units) - Fisher Scientific Isotemp Series User Manual

Gravity and convection incubators
Table of Contents

Advertisement

Preparing the Work Space

Upon delivery, Fisher Scientific incubators are not in a sterile state. Before the initial start-up,
the incubator must be decontaminated.
The following work space components should be checked for cleanliness and disinfected prior
to use:
• support rails (table-top units),
• shelf support,
• perforated shelves,
• work space surfaces,
• work space seals and gaskets,
• glass door

Installation of the Support Rails (only for table-top Units)

Figure 5-4 Support Rail Installation
The embossings at [2] and [5] act as lateral guides for the support rails, while the embossings
at [1] and [6] secure the support rails in place. For the support rails to install correctly the
retaining spring [3] must be facing upwards.
Fisher Scientific
For details about the cleaning and disinfection of the incubator, please
refer to
"Cleaning"
on
Disinfection
page
9-1.
Gravity Convection Incubators
Start-up
Preparing the Work Space
5-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isotemp 60l incbtr grvity 120vIsotemp 100l incbtr grvity 120vIsotemp 180l incbtr grvity 120vIsotemp 100l incbtr fa 120vIsotemp 180l incbtr fa 120vIsotemp 60l incbtr fa 120v

Table of Contents