Leveling The Load Frame; Leveling The Table-Top Load Frame - MTS Systems Exceed 40 Series Product Manual

Hide thumbs Also See for Exceed 40 Series:
Table of Contents

Advertisement

Leveling the Load Frame

Leveling the Table-Top Load Frame

Equipment
Procedure
Turn bottom nut to adjust level.
MTS Exceed™ Series 40 Product Manual
Level the table-top load frame immediately after you position it for installation.
This prevents the base from rocking and provides a level test surface for more
accurate test results.
The following items are required:
Spirit or bubble level
Open-end wrench
To level the frame base:
1. Place a spirit or bubble level on the center of the base beam.
2. Loosen the top nut on each leveling foot.
3. Using an open-end wrench, alternately adjust the height of each leveling
foot while you monitor the spirit or bubble level reading.
4. Rotate the spirit or bubble level 90° to verify that the load frame is level side
to side and front to back.
5. When the machine is level, tighten the top nut on each leveling foot.
Leveling the Load Frame
Frame Base
Loosen the top nut.
Leveling Foot
Installation
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E42.503E45.105E45.305E45.605E43.104E44.104 ... Show all

Table of Contents