Troubleshooting guide
Wrong connection cable
used to connect the PC
to the PR010/T test unit
The serial cable is not
properly connected
The PR010/T unit is not
ready for Sw updating
The PR010/T's time-out
elapses
before
software
starts
downloading from the PC
The update file is not
selected
The wrong type of file is
selected
The file downloaded is
damaged
Wrong connection cable
used to connect the PC
to the PR010/T test unit
The serial cable is not
properly connected
The PR111-type release
is fitted with the wrong
adapter
The PR111 adapter is
damaged
A cable for the Isomax
series is connected to an
Emax circuit breaker, or
vice versa
SACE PR010/T
Replace with the cable supplied
and repeat the operation
Make sure the cable connectors
are properly inserted
Proceed as described under the
heading
"Sw
procedures"
Make sure the PR010/T unit
the
displays the message "Waiting for
update" at the start of the file
transfer procedure
Select
the
required
version and repeat the update
procedure
Select file type PR010t_x.Hex
Use a spare copy or download
the updated software version
from our Internet site
Replace with the cable supplied
and repeat the operation
Make sure the cable connectors
are properly inserted
Fit the correct PR111 adapter
Replace with the spare one
supplied
Use the correct cable for the
circuit breaker