Positioning The Screen And Projector; Positioning The Screen And Projector - Digital Projection 8K Series Installation And Quick-Start Manual, Connection Manual, Operating Manual, Reference Manual

High brightness digital video projector
Table of Contents

Advertisement

Digital Projection INSIGHT Laser 8K Series

Positioning The Screen And Projector

1.
Install the screen, ensuring that it is in the best
position for viewing by your audience.
2.
Mount the projector, ensuring that it is at a
suitable distance from the screen for the image
to fill the screen. Set the adjustable feet so that
the projector is level, and perpendicular to the
screen.
The drawings below shows the feet for table
mounting, and the fixing holes for ceiling mounting.
Also shown is one of four rings each located in the
top corners. These can be used for lifting a single
projector.
Four stacking points
1
Four adjustable feet
2
Four M10 holes for ceiling mount
3
The screws should not penetrate
more than 18 mm into the body of
the projector.
Stacking point at the top of the
4
projector
Lifting ring (for handling a single
5
projector)
The rings can be removed to reveal
M10 x 18 deep holes for ceiling
mounting.
Installation and Quick-Start Guide

POSITIONING THE SCREEN AND PROJECTOR

1
2
3
3
2
1
Bottom view of the projector
1
2
3
4
5
3
2
1
Top corner (detail)
Notes
Always allow the projector
to cool for 5 minutes before
disconnecting the power or
moving the projector.
Ensure that there is at least 30
cm (12 in) of space between the
ventilation outlets and any wall,
and 10 cm (4 in) on all other
sides.
Rev A October 2018
page 10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Insight laser4k-uhd series4k series

Table of Contents