Reengineering In The Parameter Setting Tool - ABB Relion Series Engineering Manual

Grid automation
Hide thumbs Also See for Relion Series:
Table of Contents

Advertisement

1MRS757810 C
8.5.2
REC615 and RER615
Engineering Manual
GUID-EE5D5400-8D26-43CA-AED9-5CBF176EB21E V1 EN
Figure 99:
Every LED input is connected to the corresponding LED block
6.
Save the configuration and click the Validate configuration button from the
PCM600 toolbar.
GUID-1FA0981B-9E5B-4021-8DDE-ADAED8636930 V2 EN
Figure 100:
Validating configuration

Reengineering in the Parameter Setting tool

Parameter values remain unchanged for all the functions listed in Versioned Functions
and Hardwares list. Parameter values remain unchanged also for the functions not
listed in the migration report, that is, the functions that have the same version in both
the product versions.
Set the parameter values again for all the needed functions.
Section 8
Configuration migration
135

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rer615Relion rec615

Table of Contents