Aqua Lung Rapid Diver User Manual page 9

Table of Contents

Advertisement

2. Insert the open end of the cylinder band through the webbing on the bottom
of the BC. Position the ribbed side of the traction sleeve face up. Insert the
cylinder band into the top of the traction sleeve, under the front cylinder mount
straps and out the bottom of the traction sleeve (Fig. 2). The traction sleeve
should be positioned directly over the front cylinder mount (Fig. 3). Repeat
process for other cylinder band.
Fig. 2
3. The procedure for weaving the cylinder band through the cam buckle is covered
in Threading the Cam-Buckle section of this manual.
4. Open the cylinder band buckles and loosen the bands.
5. Insert the cylinder into the bands from the
right side. Position the cylinder so that the
valve on/off handle is pointed down towards
the diver's feet (Fig. 4).
6. The procedure for securing the cylinder
band to the cylinder is covered in Securing the
Band to the Cylinder section of this manual.
Fig. 3
Fig. 4
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents