Maintenance Manual
Commissioning Procedures
Commissionin g Procedur es
C-1
C-1 Perform 50 H our Service
Perform 50 Hour Service
The 50 hour maintenance procedure is a one time
sequence of procedures to be performed after the
first 50 hours of usage. After this interval, refer to
the maintenance inspection report for continued
scheduled maintenance.
1
Perform the following maintenance
procedures:
All Models:
Q-6
Inspect the Tires, Wheels and Lug Nut
Torque
A-5
Replace the Hydraulic Filters
24
C-2
C-2 Perform Engine M aintenanc e – 50 Hours
Perform Engine Maintenance - 50
Hours
The 50 hour maintenance procedure is a one time
sequence of procedures to be performed after the
first 50 hours of usage. After this interval, refer to
the maintenance inspection report for continued
scheduled maintenance.
All Models
• Check Belt Tension
• Check The Engine Mounts
• Check Hose Clamps
John Deere Models
• Engine oil - replace
• Engine filter - replace
Required maintenance procedures and additional
engine information are available in the
manufacturer's manuals. Refer to Specifications,
Engine Operator and Maintenance Manuals
Genie Telehandlers
September 2016
.
Part No. 1272858