Siemens MOTOX BA 2010 Operating Instructions Manual page 43

Gearbox
Hide thumbs Also See for MOTOX BA 2010:
Table of Contents

Advertisement

Procedure
1. Remove the axial fastening from the hollow shaft.
2. Drive out the machine shaft using the disk
threaded spindle
You have now removed the hollow shaft with parallel key.
Design suggestion for threaded block and disk
Size
28
38
48
68
88
108
128
148
168
188
BA 2010
Operating Instructions, 02/2018, A5E38093846A/RS-AC
4.10 Removing and installing the shaft-mounted gearbox
and hexagon nuts
b10
b11
b12
[mm]
[mm]
[mm]
3
15
10
-
15
10
6
6
15
5
7
20
7
7
20
10
10
24
10
10
24
5
10
24
7
10
30
8
10
30
11
, threaded block
.
d10
d11
[mm]
[mm]
19.9
10
24.9
14
-
14
29.9
18
34.9
24
39.9
28
39.9
28
44.9
33
49.9
36
59.9
45
59.9
45
69.9
54
69.9
54
79.9
62
79.9
62
89.9
72
99.9
80
109.9
90
119.9
95
Installation
, parallel key
,
s11
t
u
max
[mm]
[mm]
M6
22.5
6
M8
28
8
M8
28
8
M10
33
38
10
M12
43
10
12
M16
48.5
12
14
M16
64
14
18
M20
74.5
18
20
M20
85
20
22
M20
95
22
25
M24
106
28
116
M24
127
32
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents