Mounting 90 Mm Devices With Device Connectors On The Wall - Siemens SIRIUS 3SK1 Manual

Industrial controls, safety engineering, safety relays
Hide thumbs Also See for SIRIUS 3SK1:
Table of Contents

Advertisement

8.14

Mounting 90 mm devices with device connectors on the wall

Requirements
Please note the following requirements for mounting on a level surface:
● Please observe the information about the mounting position in the chapter "General
technical data (Page 193)".
● Please note the spacing of the drilled holes in the chapter "Dimension drawings for 3SK1
devices (Page 243)" and "Dimension drawings 3SK1 device connectors (Page 251)".
● Two properly executed drill holes with thread or plug on the level surface (per device
connector)
● Two screws (per device connector) to fit the holes M4 x12 in accordance with DIN 784
● Device connector
Please refer to the accessories list for the relevant order number in the chapter
"Accessories (Page 257)".
3SK1 safety relays
Manual, 04/2013, A5E02526190021A/RS-AA/01
8.14 Mounting 90 mm devices with device connectors on the wall
Mounting
151

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents