Set-Up; Installation; Electrical Connection; Connection Of Othe Cms Units - Weco cad III Operation Manual

Table of Contents

Advertisement

4 Set-up

4.1 Installation

4.2 Electrical connection

4.3 Connection of othe CMS units

Open top of cardboard box
Remove machine with foam wrap (upwards)
Place the machine side ways on a soft underground and remove
packing material
Position the machine in such a way that the highest
productivity is ensured..
Note: :
Do not expose the device to direct sunlight, heating
For correct operating temperature see chapter 3.6.
Note:
Please follow safety guidelines (see 1).
Check wether the voltage indicated on the WECO type plate is
conform with the local power supplier.
Connect the power supply cable at the back side of the
CAD2000.
Connect the power supply cable with a correctly installed socket.
Switch on the machine.
Connect CMS units with interface cable
Secure the plug with the screws
systems etc.
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents