Huawei RRU3269 Installation Manual page 75

Hide thumbs Also See for RRU3269:
Table of Contents

Advertisement

RRU3269
Installation Guide
As shown in the figure above, it is recommended that the mounting kits be installed at a position 1200
mm (47.24 in.) to 1600 mm (59.06 in.) high above the ground. If the space is insufficient, only the 3.5
Installation Clearance Requirements of an RRU needs to be provided.
Step 2 Install the RRU mounting kits, as shown in Figure 8-24.
Figure 8-24 Installing the RRU mounting kits
Ensure that the arrows on the pole mounting kits are pointing up.
1.
2.
Issue Draft B (2018-05-15)
Figure 8-23 Distance between the mounting kits and the ground
Adjust the position of the nut and remove the square-neck bolt at the open end from the
slot on the auxiliary bracket.
Slide the mounting kits onto the U-steel horizontally and insert the square-neck bolt into
the slot.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing the RRU
67