RRU3269
Installation Guide
2.
(1) Lifting sling
Do not remove the stretch sling and protection pipe or bind optical fibers using one sling, as
shown in Figure 7-8.
Issue Draft B (2018-05-15)
Installation engineer B places the fiber coiler for coiling optical fibers on the fiber spools,
and installation engineer D lead the lifting sling through the stretch sling of the optical
fibers and use the other sling as a traction sling to secure the cables 4 m (13.12 ft) away
from the lifting sling, as shown in Figure 7-7.
Figure 7-7 Binding optical fibers
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Hoisting an RRU and Related Cables onto a Tower
(2) Stretch sling
(3) Traction sling
44