RRU3269
Installation Guide
Inner hexagon wrench
5 mm (0.2 in.)
Utility knife

2.3 Skills and Requirements for Onsite Personnel

Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
Before the installation, pay attention to the following items:
Issue Draft B (2018-05-15)
The customer's technical engineers must be trained by Huawei and be familiar with the
proper installation and operation methods.
The number of onsite personnel depends on the engineering schedule and installation
environment. Generally, only three to five onsite personnel are necessary.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Fixed pulley
(weight-bearing
capacity > 500 kg or
1102.5 lb)
Level
2 Installation Preparations
Lifting sling
Protective gloves
4