RRU3269
Installation Guide
Figure 7-9 Hoisting power cables onto the tower
(1) Lifting sling
1.
2.
The connector on the power cable in the figure is only an example. The actual connector may vary
according to the situation.
Issue Draft B (2018-05-15)
After climbing up to the tower, installation engineer A secures the fixed pulley to the
tower platform support and leads the lifting sling through the fixed pulley.
Installation engineer B secures three cable ties to the power cable connector, and then
secures the power cable to the lifting sling, as shown in Figure 7-10.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Hoisting an RRU and Related Cables onto a Tower
(2) Fixed pulley
46