Make sure that the cable drum is in a serviceable condition
Check that the correct length of HVSC Plus downconductor has been supplied. The length
of HVSC Plus will be marked on the drum
If the HVSC Plus downconductor has been upper terminated on the outside of the drum,
then the HVSC Plus downconductor will need to be hauled up the structure with the drum
staying on the ground
If the HVSC Plus downconductor has been upper terminated on the inside of the drum,
then the drum has to be taken to the top or near the top of the structure. Then the HVSC
Plus downconductor can be hauled downwards from the drum to the ground
Any lifting slings or ropes must be securely attached
DO NOT haul the HVSC Plus downconductor from the termination. See Figure 12
Protect the HVSC Plus downconductor at all times when it is being moved
Figure 12.
Correct method of hoisting
HVSC Plus
20
LIGHTNING PROTECTION INTERNATIONAL PTY LTD
Incorrect method of hoisting
HVSC Plus
www.lpi.com.au

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stormaster ese 30Stormaster ese 50Stormaster ese 60

Table of Contents