Checking Lightning Protection Components Supplied
The LPI Stormaster ESE components received should be checked against the "bill of materials"
for loss during shipping and for damage.
Check the following:
Terminal(s)
∆
Terminals have not been dented or damaged in any way during transit
∆
Instructions, warning labels, warranty, test certificate and relevant mast base components
are supplied
Downconductor(s)
∆
The HVSC Plus cable drum (if supplied) is not damaged
∆
The correct HVSC Plus length(s) have been supplied
∆
There is no obvious damage to the HVSC Plus cable
∆
If a factory completed upper termination is supplied, check to see that the termination is
not damaged and confirm inside or outside termination(s)
∆
Order of lengths and quantities of HVSC Plus (if multiple lengths on one drum), will be
shown on the side of the cable drum(s)
LPI Stormaster ESE Installation
All site and safety requirements must be followed during the installation of the LPI Stormaster ESE.
The correct order of installation is as follows:
1. Installation of the lightning earth.
2. Installation of the HVSC Plus downconductor.
3. Lower termination of the HVSC Plus downconductor and connection to the lightning earth.
4. Upper termination of the HVSC Plus downconductor and connection to the Stormaster ESE
terminal.
5. Preparation and raising of the mast into position.
LPI Stormaster ESE should only be installed during storm free periods.
If the Stormaster ESE terminal needs to be raised prior to connection to the lightning earth or
immediate connection is not possible, then connect the lower end of the downconductor to
structural steel reinforcing or other suitable earth point.