Živojina Lazića Solunca 6, 36000 Kraljevo, Serbia, tel: 036/390-140, 390-150, e-mail: radijator@radijator.rs TECHNICAL INSTRUCTIONS FOR ASSEMBLY, OPERATION AND MAINTANCE OF ELECTRIC BOILER EK SMART EU 06-09-12-16-18-21-24-27 kW...
Table of content 1. Explanation of the symbols and safe work instructions ..................3 1.1 Introduction ..............................3 1.2 List of symbols with explanations ........................ 3 1.3 General boiler safe work instructions ......................3 2. Information about the boiler ..........................5 2.1 Description of the product ..........................
Explanation of the symbols and safe work instructions 1.1 Introduction These technical instructions contain important information about adequate assembly, commissioning, handling and maintains of the device. It is intended for authorized installers, authorized service technician’s and end – users of the electro-boiler.
Page 4
Ensure technical approval of the installation in accordance with the relevant regulations. Danger due to compromising one’s own safety in case of need, e.g. in case of fire Never put yourself in a life-threatening situation. Your safety should always come first.
Hand over boiler technical documentation to the end-user. Environmental protection/Disposal of waste Dispose of packaging in an environmentally friendly manner. Dispose of the boiler in an environmentally friendly manner at the recycling spot. Cleaning of the boiler Clean the boiler on the outside with a damp cloth. Information about the boiler 2.1 Description of the product EK-SMART EU is produced with the following powers:...
Page 6
Picture 1. Boiler overview: isometric view, front side, left and right side, top side, bottom side...
Page 7
Picture 2. Boiler components 1 - LCD display 2 – Expansion vessel 3 – Automatic air vent 4 – Pressure safety valve 5 – Safety thermostat 6 – Exchanger 7 - Pump Picture 3. Connection for hot and cold water 8 - Cold water Picture 4.
EK 06 Smart MONO EU and EK 09 Smart MONO EU, boilers with Three Phase connectors are EK 06 Smart EU and EK 09 Smart EU. When purchasing the product, you should emphasise which connector you want. Subsequent “reconnections” are not approved by the manufacturer.
2.4 Minimum separation distance and flammability of building materials Minimum separation distance from inflammable materials may differ from country to country. Please adhere to the regulations on electrical installations and prescribed minimum distances in your country. The following table shows the classification of flammability of building materials as per DIN 4102.
2.9 Name plate Standard plate of the boiler is located on the outside of the boiler and contains the following technical data: model, voltage, power, serial number, year of production. 2.10 Dimensions and technical data Picture 5. Dimensions A=640mm; B=400mm; C=290mm...
Page 11
Models Power Number of levels of power Division of levels of power 6x1.5 6x1.5 6x2.67 9x2,33 9x2.67 Mains voltage Built-in fuse 1x32 3x10 1x40 3x16 3x20 3x25 3x32 3x32 3x40 3x40 Min. cross-section of connection 5x2.5 3x10 5x2.5 5x10 cable Safety valve Max.
3. Transport of the boiler NOTE: Transport damages Pay attention to transport instructions found on the packaging Use a suitable transport vehicle, e.g. a trolley with a tightening strap. During the transport, the boiler must be in a lying position. Avoid blows or collision with various objects.
Prior to any works on the heating installations, the power supply should be disconnected. Unskilled and unauthorised attempts of connecting under voltage may cause material damage on the boiler, which may further lead to dangerous electric shocks. 4.2 Clearance around the boiler to floor, wall and ceiling DANGER: Risk of fire due to flammable materials or liquids! Do not store flammable materials or liquids in the vicinity of the boiler.
4.3 Removal of the boiler front casing Prior to any intervention (removal of the casing), disconnect the boiler from the installation. Boiler casing may be removed for easy handling and installation. Boiler removal is performed in the following way: 1. Unscrew the screws at the left, as shown in the picture. 2.
Picture 5. Position of screw anchors for assembly a=220mm; b=80mm; c=23mm; d=560mm 5. Boiler hydraulic scheme Heat pipes should be connected in the following manner Connect the cold water connection to the connection 8, picture 3. Connect the hot water connection to the connection 9, picture 3. Filling the boiler with heating water and testing welded joints and tightness: Testing tightness should be carried out before commissioning the boiler.
Page 16
DANGER: Health risks due to mixing the drinking water and water from heating installation! Comply with the existing regulations and norms related to avoiding mixing drinking water and water from heating installation. Comply with the norm EN1717. DANGER: Risk of fire due to flammable materials or liquids! Do not store flammable materials or liquids in the vicinity of the boiler.
Page 17
Take off the hose from the filling and drainage tap. Note down the value of the working pressure and water quality in the instruction for use. During the first filling or refilling or changing the water Comply with the request related to filling water. Purging and unblocking the heating pump Pump installed in this boiler has an automatic manner of purging, therefore, there is no need to undertake any actions to purge the pump.
Cables must have the prescribed cross-section, and the fuses must have the prescribed power. Models EK 06 Smart EU, EK 09 Smart EU, EK 12 Smart EU, EK 16 Smart EU, EK 18 Smart EU, EK 21 Smart EU, EK 24 Smart EU, EK 27 Smart EU (400V 3N ~).
Page 19
The set of tree-way automatic switches is supplemented by remote voltage relay, this providing a safety assembly unit which, in addition to short-term over-current protection, also reacts to thermal overload (a signal from safety thermostat activates voltage relay) and in the same moment, interrupts the power supply of all three phases to the boiler.
Page 20
Picture 10. Electrical wiring diagram EK 06 Smart EU Picture 11. Electrical wiring diagram EK 06 Smart MONO EU...
Page 21
Picture 12. Electrical wiring diagram EK 09 Smart EU, EK 12 Smart EU, EK 15 Smart EU Picture 13. Electrical wiring diagram EK 09 Smart MONO EU...
Page 22
Voltage release H1, H2, H3 Heaters Terminal Blocks EK Smart EU X1-1 Terminal Blocks-blue EK 06 Smart EU: H1=3x2kW X1-2 Terminal Blocks-ground EK 09 Smart EU: H1=H2=3X1,5kW X1-3 Fuse terminal block 2A EK 12 Smart EU: H1=H2=3X2kW STB thermostat EK 15 Smart EU: H1=H2=3X2,667kW...
7. Operating the boiler 7.1 Safety instructions The user may use and adjust only the functions found in the user menu turn on and turn off the boiler. All other adjustments should be performed by a professional (authorized service technician). Only adults acquainted with the instruction and the manner of work of the boiler may operate the boiler.
values is currently on the display, the adequate LED indicator also beams. The temperature and power interchange approximately every 3 seconds. 7.3 Alarm Warning bearing the A sign are alarms. Their role is to signalize a potential problem, and that the parameters are approaching border values for safe work of the system.
When you enter the password, press OK and the symbols of parameters from the service menu will appear on the display. Resetting the boiler For resetting the boiler, press and hold OK key for a few seconds. 7.8 Turning the boiler on/off When there is no need for the boiler to work, press ON/OFF button and hold it for at least half a second.
Page 26
Parameters of the hidden menu Factory Scope of Unit DESCRIPTION value setting 3/6/9 3/6/9 Number of relay outputs supported by automation system 1,0-3,0 Power of one heating element built-in in the boiler 0 or 1 ROOM THERMOSTAT 0 –room thermostat is installed 1 –room thermostat is not installed 0 or 1 ANTIFREEZE PROTECTION LIQUID...
Page 27
Hysteresis for heating elements – more about this parameter in the section principle of operating the electric boiler. Sz – set boiler power; Sz-1 – boiler power reduced by one level of power; Sz-2 – boiler power reduced by two. Picture 27.
9. Boiler commissioning NOTE: First commissioning must be carried out by an expert – authorised service technician. - Before commissioning, check the tightness of the hydraulic network. All the valves in the network, including thermostat if any, must be in a position (open) which enables smooth water circulation through the boiler and pipe network.
WARNING: Material damage caused by frequent filling up of water! Due to frequent filling up of the heating installation with water, depending on the water characteristics the installation may be damaged by corrosion or lime scale. ightness of the heating installation and functional operation of the expansion vessel should be tested.
In accordance with the WEEE Directive 2012/19/EU (Waste Electrical and Electronic Equipment),Law on Environmental Protection (Official Gazette of the Republic of Serbia, No.135/2004, 36/2009,36/2009– as amended,72/2009– as amended,43/2011- decision of the Constitutional Court and 14/2016), Law on Waste Management (Official Gazette of the Republic of Serbia, No.36/2009,88/2010and14/2016) and Rulebook on the list of electrical and electronic products, measures restricting or prohibiting the use of electric and electronic equipment containing hazardous substances, the manner and procedure for management of waste originating from electrical and electronic products...
14. Warranty Co. “Radiator Engineering” covers different warranty periods for different parts (as specified further on) only if the following conditions of the warranty are fulfilled: 1.1. The boiler must be connected to the aforementioned hydraulic diagram from the Technical instructions; 1.2.
Page 32
6.6. If it has been established that the hydraulic scheme has not been made according to the recommendations of the company "Radiator Engineering"; 6.7. If the customer was using the product over the declared properties and under normal circumstances. 7. The warranty period shall cease to be valid: 7.1.