Screen Panel Replacement - DERRICK HYPERPOOL SHAKER Maintenance & Operation Manual

Sgx motor
Table of Contents

Advertisement

MAINTENANCE
SCREEN FRAME (CONT'D)
Figure 5-1. Screen Frame Inspection and Maintenance

SCREEN PANEL REPLACEMENT

Use the following procedure when changing screen panels. If installing panels for the first time,
follow only the instructions under Installation. Screen panel replacement is done with the installer
on the compression side of the screen frame.
Removal
1. Stop the flow of feed slurry to the feeder and desander/desilter.
2. Wash screen panel to remove residue from panel surfaces.
3. De-energize vibrator motors, and lock out and tag out electric power.
HP-704 screen bed. Note compression pins and panel locators.
4. Remove compression handle from holder, and insert into handle tube of compression
assembly.
5-4
15 Jun 12
HyperPoolShaker

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HYPERPOOL SHAKER and is the answer not in the manual?

Table of Contents

Save PDF