Fully installed panel. Note downward curve into intimate contact with screen bed
6. Repeat procedure for three remaining screen panels.
MACHINE STARTUP
Refer to Section 4 for initial startup and operating procedures for the HP-704 shaker.
WARNING! DO NOT ATTEMPT TO OPERATE MACHINE WITH SHIPPING
BRACKETS INSTALLED.
15 Jun 12
Screen panel notch engaged with locator
Compressing screen panel
INSTALLATION
3-13
HyperPoolShaker
Need help?
Do you have a question about the HYPERPOOL SHAKER and is the answer not in the manual?