System Operation - Intec FORCE/2 HP Instruction Manual

Insulation blowing machine
Hide thumbs Also See for FORCE/2 HP:
Table of Contents

Advertisement

System Operation:

1. Energize System
a.
b. Press the Power Button to energize the system.
The button's LED will illuminate green when the
system is energized.
c.
d. Ensure the Blower Variable Speed button is in the
desired position. If it is in the 'ON' position, the
button's LED will be illuminated green and if it is in
the 'OFF' position the button's LED will be
illuminated red.
Note 1: If you desire to use the blower's variable speed, place this switch in the 'ON'
position. Then, set the variable speed dial to the desired setting based on desired blower
speed.
Note 2: If you desire maximum blower volume and pressure, place this switch in the
'OFF' position. This setting provides for maximum production rates.
2. Activate System using either the wired or wireless remote system.
a. If the rotary control switch is in the Wired Remote setting, place the blower toggle
switch on the wired remote in the 'ON' position to start the blower motor. Place the
blower toggle switch in the 'OFF' position to stop the blower motor. Place the agitator
T: 303-833-6644
Original Language - English
Variable Speed Push Button
800-666-1611
or
Power Button
Instruction Manual
www.inteccorp.com
|
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents