Hirschmann RS20 User Manual page 36

Redundancy configuration industrial ethernet (gigabit) switch
Hide thumbs Also See for RS20:
Table of Contents

Advertisement

Ring/Network Coupling
The coupling between two networks is performed by the main line (solid blue
line) in the normal mode of operation, which is connected to the partner
coupling port. If the main line becomes inoperable, the redundant line
(dashed blue line), which is connected to the coupling port, takes over the
ring/network coupling. The coupling switch-over is performed by one Switch.
 Select the Redundancy:Ring/Network Coupling dialog.
 Select "One-Switch coupling" by means of the dialog button with the
same graphic as below
2
STAND-BY
Figure 9: One-Switch-coupling
1: Coupling port
2: Partner coupling port
The following settings apply to the switch displayed in blue in the
selected graphic.
 Select the partner coupling port
.With "Partner coupling port" you specify at which port you are
connecting the control line.
You will find the port assignment for the redundant coupling in
table 8.
36
(see fig.
1
ON
4.2 Preparing a Ring/Network
9).
(see fig.
10).
UM Redundancy Configuration L2E
Coupling
Release 7.1 12/2011

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents