2 Getting Started

2.1 Parts List

Inspect the shipping container for damage.
If the shipping container seems to be damaged, keep it until you have inspected the contents
and you have inspected the TED200C controller mechanically and electrically.
Verify that you have received the following items within the package:
1. 1 TED200C controller
2. 1 power cord, connector according to ordering country
3. 1 operation manual
4. 1 connection cable CAB420-15

2.2 Preparation

Prior to operate a TED200C controller, check if the set line voltage matches with your local
power supply and if the appropriate fuses are inserted. (See sections
and
Replacing the Mains Fuses
Connect the unit to the power line using the supplied cable. Turn the unit on by pressing the
line switch (F11)
.
8
If required, the chassis ground can be connected to ground potential via the connector jack R4.
© 2015 Thorlabs
)
19
2 Getting Started
Line Voltage Setting
18
7