Maintenance - Siemens SICAM P35 Manual

3-phase multi-function power meter
Table of Contents

Advertisement

Maintenance

7.1 Maintenance
7.1
Maintenance
• Voltage connection should be conducted strictly in accordance with voltage level marked on nameplate.
• Tighten the terminals and hang the meter securely to screen which is strong, refractory and vibration-free
during installation. Upward view of the meter provides the best display effect, so it should be installed verti-
cally.
• The meter should be stored in environment free of condensation at -35 ℃ to 70 ℃ and ≤ 95% humidity in
original package. At most 5 layers are allowable for stacking. The meter is inappropriate for storing after un-
packing. The meter should be stored in clean location free of hazardous substances or gas which may cause
corrosion in air.
• In the operating environment of the meter, lightning protection should be provided.
50
SICAM P35 P36, 3-phase Multi-Function Power Meter, User Manual
E50417-H8940-C562-4, Release Date 06.2018

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sicam p36

Table of Contents