Terminals And Wiring Diagram - Siemens SICAM P35 Manual

3-phase multi-function power meter
Table of Contents

Advertisement

5.3

Terminals and Wiring Diagram

Definition of Terminals (viewed from rear to front and from left to right)
1. Upper main terminals
V+
Note
NC means no connection, the same below.
2. Lower main terminals
V1
Note
Main terminals are barrier terminals which can be connected using fork or ring-type lug (no more than 6.5 mm
wide). For cables to be connected to upper and lower main terminals, cold-pressed UT2.5-3 terminal is
recommended before connection. The diagram of connection is below.
Figure 5-2
SICAM P35 P36, 3-phase Multi-Function Power Meter, User Manual
E50417-H8940-C562-4, Release Date 06.2018
V-
NC
NC
V2
V3
VN
Connection Diagram of Main Terminal
R11
R12
R21
I11
I12
I21
Installation and Wiring
5.3 Terminals and Wiring Diagram
R22
I22
I31
I32
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sicam p36

Table of Contents