Operation Process; Set Temperature Required; Set Time Required; Set Pressure Required - Sefa Initium iCAP 2 Instruction Manual

Table of Contents

Advertisement

V. OPERATION PROCESS

1. SET TEMPERATURE REQUIRED

Turn on power switch.
The digital display shows

2. SET TIME REQUIRED

Press button after temperature
setting and the time light is
on. Select with arrows the time
according to different transfer
material

3. SET PRESSURE REQUIRED

1) Gently lower the handle (without closing it) to put the heating element in contact with the lower plate tray,
2)
Loosen the screws on the front
Increase the pressure by turning in the direction of clockwise,
3)
Decrease the pressure by turning anticlockwise
4)
5) Tighten the screws on the front
Press button "OK" , the light is
on (C denotes Celsius). Press
۸
۷
arrows
or
to select "C" or
"F" (F denotes Fahrenheit)
according to your habits
Press button after time setting;
the display shows the temperature
starts to rise. "CD-L" shows the
time counting down during your
transfer.
①,
①.
Page 8
Press button "OK", the temp light
is on. Select with arrows the
temperature according to different
transfer material (Normally
180.~200° C.)
Hot Port
Cold Port
Note: There are two small port in
front side of the digital display.
If the real temperature is lower
than digital controller shown, you
can adjust the "hot port"; Clockwise
to raise temperature; anticlockwise
to reduce temperature.
V0414

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Initium iCAP 2 and is the answer not in the manual?

This manual is also suitable for:

Initium ilogo

Table of Contents