Cisco ASR-920-20SZ-M Hardware Installation Manual page 45

Aggregation services router
Hide thumbs Also See for ASR-920-20SZ-M:
Table of Contents

Advertisement

Install the Router
Figure 22: Locking the Power Retainer Cord
Step 4
Connect the other end of the power cord to an AC-input power source.
Step 5
Verify power supply operation by checking that the power supply LED is green.
Step 6
If the LEDs indicate a power problem, see LED Indicators section for troubleshooting information.
Step 7
If you are installing a redundant power supply, repeat these steps for the second power source.
Note
If you are installing a redundant AC power supply, ensure that each power supply is connected to
a separate power source in order to prevent power loss in the event of a power failure.
Cisco ASR-920-20SZ-M Aggregation Services Router Hardware Installation Guide
Activate an AC Power Supply
39

Advertisement

Table of Contents
loading

Table of Contents