Download Print this page

Kauber InCeiling Installation Manual page 9

Ceiling projection screen

Advertisement

10. After connecting the power supply (see page no.15) slide the screen onto the mounted rods and screw
each of the 4 M8 nuts using the included pipe wrench while checking the stability of the entire
installation (Fig.8). A properly installed screen must be levelled. Correct the fixing by unscrewing or
screwing the mounting nuts on the appropriate threaded rods.
Fig.8
A properly installed screen is shown below (Fig.9). All connections are countered. Such an installation
protects the screen against the occurrence of vibrations and possible resonances. The movement of the
nuts 1 and 2 allows to accurately level the screen, which is required for the proper operation of the
screen.
counter
Nut 1
Nut 2
Fig.9
CEILING
Pin
SCREEN
w
w
w .
k
a u
b
e
r .
e
-9-
u

Advertisement

loading