Download Print this page

Kauber InCeiling Installation Manual page 6

Ceiling projection screen

Advertisement

Fig.2a
4. Hold the template, and then guide the marker through the holes in the template to mark the drilling of
holes mounting in the fixed ceiling, (Fig.3).
Fig.3
5. Using the ø10 drill, drill the holes for the mounting dowels in the marked places. The holes should be
drilled in the correct order, starting with the hole marked on the template with the number 1 (Fig.4).
After drilling the hole 1 correctly, move to drilling holes 2 and 3. Then, drill holes 4 and 5. Repeat for
the opposite side.
w
w
w .
k
a
u
b
e
r .
e
-6-
u

Advertisement

loading