Download Print this page

Kauber InCeiling Installation Manual page 8

Ceiling projection screen

Advertisement

7. Threaded rods have to be cut to the appropriate length using the following formula:
rod length
8. After cutting, each of the threaded rods should be screwed into a suitable hole in the mounting support,
and then countered with an M8 nut (Fig.6).
Fig.6
9. Tighten each of the mounted rods with an M8 nut at a distance of approx. 5-6 cm from the bottom end
of the rod, then try on the screen cassette. If necessary, adjust the position of the nut so that the
mounting brackets of the screen cassette rest on the nuts and the bottom edge of the cassette rests
against the suspended ceiling.
Fig.7
distance between the fixed ceiling
=
and the bottom edge of the suspended
ceiling
w
w
w .
k
a
u
b
e
r .
e
-8-
- 7 cm
u

Advertisement

loading