Download Print this page

Procopi ProSwell Weva octo 440 Installation Instructions Manual page 9

Advertisement

»
INSTALLATION INSTRUCTIONS
ASSEMBLY OF THE OCTO POOL STRUCTURE (contd.)
> >
13
Mount a corner junction piece (junction+corner blister pack) in each corner using 2 SS screws (bag E) inserted through
the notches intended for this purpose. Make sure that these parts are flush with the top of the pool wall. Each wall will
take a 1.18 m length of track and an additional length that will need to be trimmed to size.
Prepare the 8 additional pieces of track according to the table below. Before making the cuts, check that the total length
of the track is equal to the distance between two corner pieces less 2 mm to allow for the corner pieces. Make sure that
the cuts are straight and clean. Deburr the cuts using the fine grain file.
15
Fit the long section into the corner piece. Bend the track to facilitate fitting onto the junction piece. Hold the track
in position using a screw 2 cm from each end. Then complete attachment of the track by inserting screws at 20 cm
intervals.
17
FITTING THE UNDERLAY:
Important!
The ground underneath the underlay should be absolutely flat and free of any bumps or rough areas.
Because of the pressure exerted by the water, even the smallest bump will be visible underneath the liner. After clear-
ing the ground, spread a layer of sand mixed with cement (1 part cement to 7 parts sand) over the floor of the pool and
compact it. This layer should be no more than 1 cm deep. (The sand and cement are not supplied). Unfold the underlay
in the pool taking care to line it up correctly with the corners. Smooth out any wrinkles. The underlay will be slightly
smaller than the pool structure.
/ OCTO & OCTO+
14
16
18
9
proswell.fr

Hide quick links:

Advertisement

loading