Before Installing - Crown Boiler FWZ Series Installation Instructions Manual

Oil-fired hot water boilers
Table of Contents

Advertisement

1) Safe, reliable operation of this boiler depends upon installation by a professional heating contractor in strict accordance with
this manual and the requirements of the authority having jurisdiction.
In the absence of an authority having jurisdiction, installation must be in accordance with this manual and the latest
edition of Installation of Oil Burning Equipment (ANSI/NFPA31). Installations in Canada comply with the requirements
of CSA B139-04 – Installation Code for Oil-burning Equipment.
Where required by the authority having jurisdiction, this installation must conform to the latest edition of Standard for
Controls and Safety Devices for Automatically Fired Boilers (ANSI/ASME CSD-1).
2) Make sure that a properly sized chimney is available which is in good condition. Consult the authority having jurisdiction,
Part VI of this manual, and ANSI/NFPA31 for additional information on venting requirements.
3) Make sure that the boiler is correctly sized:
For heating systems employing convection radiation (baseboard or radiators) use an industry accepted sizing method
such as the I=B=R Guide RHH published by the Air-Conditioning, Heating and Refrigeration Institute (AHRI).
For new radiant heating systems refer to the radiant tubing manufacturer's boiler sizing guidelines.
For systems including a Crown Mega-Stor indirect water heater, size the boiler to have either the Heating Capacity re-
quired for the Mega-Stor or the I=B=R Net Rating required for the heating system, whichever results in the larger boiler.
For systems that incorporate other indirect water heaters, refer to the indirect water heater manufacturer's instructions for
boiler output requirements.
4) In some cases, boilers installed at altitudes above 2000ft may require a different burner configuration from that at sea level.
Consult the local Crown representative for more information.
As with all oil-fired appliances, "Power Venting" this boiler creates a number of potential
problems, especially when this is done through a side wall. These include, but are not
necessarily limited to:
Accelerated rate of soot buildup on the oil burner cad-cell, burner head, and/or in the
boiler itself.
Odor complaints
Severe damage to the side of the structure in the event that the boiler operates at a high
smoke level.
These problems can occur for many reasons, some of which are out of the control of both the
installer and the appliance manufacturer. The use of a chimney to vent this boiler is therefore
recommended. If a power venter must be used, it is the responsibility of the installer and power
venter manufacturer to "engineer" the power vent system. CROWN BOILER COMPANY WILL
ASSUME NO RESPONSIBILITY FOR DAMAGE TO SIDING, ETC. FROM A POWER VENTED OIL-
FIRED BOILER. THIS APPLIES REGARDLESS OF THE CAUSE OF THE SOOTING.
III Before Installing
CAUTION
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fwz060Fwz100Fwz081Fwz130Fwz160Fwz080

Table of Contents