Download Print this page

Advertisement

Quick Links

MAX XM 100 R line
MAX XM 100 R line
MAX XM 100 R line
MAX XM 100 R line
assembly
assembly
assembly
assembly
instructions
instructions
instructions
instructions

Advertisement

loading
Need help?

Need help?

Do you have a question about the MAX XM 100 R line and is the answer not in the manual?

Questions and answers

Summary of Contents for Holzhof MAX XM 100 R line

  • Page 1 MAX XM 100 R line MAX XM 100 R line MAX XM 100 R line MAX XM 100 R line assembly assembly assembly assembly instructions instructions instructions instructions...
  • Page 2 TIME SEQUENCE TO BE FOLLOWED: 1. STRUTS AND PLATFORMS 6. BENCH 2. ARCHWAYS 7. ROOF 3. PARAPETS 8. UNDERGROUND LAYING/ANCHORAGE OF THE STRUCTURE 4. SLIDE 5. CLIMBING BOARD...
  • Page 3 NOTA BENE: it is recommended to fix the bolts definitively and only insert the caps once the Article fixing CODE N. NAME correct positioning of the elements has been num. verified. xpe11 Shaped PE nut protection cap xpe10 PE nut protection cap xpe116 PE cap ISO7089 Ø8 washer...
  • Page 4 NOTA BENE: it is recommended to fix the bolts definitively and only insert the caps once the correct positioning of the elements has been verified. 1. Position the archway between the struts and fix it by inserting: 1 x M8 washer (3), 1 x M8x260 TORX screw (2), 1 x Ø25 mm.
  • Page 5 NOTA BENE: it is recommended to fix the bolts definitively and only insert the caps once the correct positioning of the elements has been verified. 1. Position the PE parapet between the struts, resting the two lower fixing wings on the platform and then fix using: 4 x M8 washer (3) 4 x M8x80 TEL screw (2) WOOD...
  • Page 6 1. After having fixed the PE archway (2), place the body of the Article Default/ NAME curved slide (3) on the platform of the tower (1) and insert num. Quantity the bolts, necessary for fixing, into the holes present on the Aladin tower slide (3).
  • Page 7 NOTA BENE: it is recommended to fix the bolts definitively and only insert the caps once the correct positioning of the elements has been verified. 1. 1. 1. 1. I I I I nsert the (5) M8x70 threaded bars into the nsert the (5) M8x70 threaded bars into the nsert the (5) M8x70 threaded bars into the nsert the (5) M8x70 threaded bars into the...
  • Page 8 Article Default/ CODE N. NAME num. Quantity PE roof xpe10 PE nut protection cap xpe116 PE cap IS07089 Ø8 washer M8x80 TEL screw NOTE: NOTE: NOTE: NOTE: The models represented are purely The models represented are purely The models represented are purely The models represented are purely indicative.
  • Page 9 1) 1) 1) 1) PE cap (4x) PE cap (4x) PE cap (4x) PE cap (4x) 2) 2) 2) 2) PE nut protection cap (4x) PE nut protection cap (4x) PE nut protection cap (4x) PE nut protection cap (4x) 3) 3) 3) 3) M8 washer (4x) M8 washer (4x) M8 washer (4x)
  • Page 10 Concrete deck rubber safety rubber safety rubber safety rubber safety flooring flooring flooring flooring...
  • Page 11 1. Excavate a hole with diameter of 30 cm and depth of 60 cm 2. Cast a first layer of concrete with thickness of 10 cm.
  • Page 12 3. When the concrete has set, position the slide bracket in the hole, checking the correct alignment of the lower part of the slide with the finished ground level.
  • Page 13 4. Complete concrete casting as per layout. 5. When the concrete has set, fill the excavation hole by compacting the infill material up to the finished ground level.
  • Page 14 1. Attach the brackets (1) by introducing the following in sequence: PE nut protection cap (2), M8 washer (3), M8x25 HEX screw (4), PE cap (5) 1. Excavate two holes with diameter of 30 cm and depth of 60 cm NOTA BENE: it is recommended to fix the bolts definitively and only insert the caps once the correct positioning of the...
  • Page 15 1. 1. 1. 1. Drill. Drill. Drill. Drill. 2. 2. 2. 2. Clean the hole thoroughly using an air pump and small brushes. Clean the hole thoroughly using an air pump and small brushes. Clean the hole thoroughly using an air pump and small brushes. Clean the hole thoroughly using an air pump and small brushes.
  • Page 16 Article num. Quantity CODE N. NAME xfe265 59x59x35 stainless steel angle bracket xpe10 PE nut protection cap xpe116 PE cap M10 self-locking nut M8x115 screw anchor Ø10 washer 1. Position the slide on the support surface, marking the position of the screw anchor.
  • Page 17 Article Quantity CODE N. NAME 1. Position the climbing board on the support surface and num. mark the position of the screw anchors. xpe10 PE nut protection cap 2. Drill the support surface and position the screw anchors. xpe116 PE cap 3.