3 Commissioning
3.2.2
Commission Overview with BOP or AOP
Prerequisites
Mechanical and electrical Installation are completed.
DIP Switch 2: Off = 50 Hz / ON = 60 Hz
Further Commissioning via P0004 and P0003
An overview of the parameter structure is given in
For a detailed description of the parameter, see the
NOTES
We recommend the commissioning according this scheme.
48
Setting the motor frequency
Power ON
Quick Commissioning P0010 = 1
See Section 3.2.3.1
Section 5.3
Parameter List.
MICROMASTER 440
Operating Instructions
6SE6400-5AW00-0BP0
Issue 12/02