Panasonic CS-VE9NKE Service Manual page 54

Hide thumbs Also See for CS-VE9NKE:
Table of Contents

Advertisement

16.2.7 Removing the Compressor and Heat Storage Tank
1
Perform "16.2.1 Removing the Outer Top Panel and Outer Front Panel".
2
Perform "16.2.2 Removing the Electrical Component Covers (2 & 3-way valve Cover and Terminal Plate
Cover)".
3
Perform "16.2.3 Removing the Power-Supply Box".
4
Perform "16.2.6 Removing the Outer Side Panel (Right)".
5
Remove the 4-way valve coil, expansion valve coil, defrosting 2-way valve coil and heat storage tank 2-way
valve coil. Then, remove the fixing screws of the acoustic insulation board (3 pieces on the right side and 1
piece at the front bottom).
Note on assembly: When attaching the defrosting 2-way valve coil and heat storage tank 2-way valve coil,
attach the coils according to the colors indicated on the metal sheet located below the coils to the main
unit.
6
Cut the band which fixes the heat storage tank to the acoustic insulation board. Remove the acoustic
insulation board.
109

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs-ve12nkeCu-ve9nkeCu-ve12nke

Table of Contents