Panasonic CS-VE9NKE Service Manual page 50

Hide thumbs Also See for CS-VE9NKE:
Table of Contents

Advertisement

6
Disconnect the connector of the indoor/outdoor connection wires (red, white and black) and remove the fixing
screw of the earth wire (green).
7
Remove the screw (1 piece) which fixes the power-supply box to the outer side panel (right).
8
Pull the outer side panel (right) towards you while pulling up the fixing tab (1 location) of the powersupply box
to disengage the tab.
9
Lift up the power-supply box to remove it.
16.2.4 Removing the Control Board
1
Perform "16.2.1 Removing the Outer Top Panel and Outer Front Panel".
2
Perform "16.2.2 Removing the Electrical Component Covers (2 & 3-way valve Cover and Terminal Plate
Cover)".
3
Perform "16.2.3 Removing the Power-Supply Box".
4
Disengage the tabs (6 locations) and remove the metal cover.
Notes on disassembly: During the replacement of outdoor control board, the control board and plastic
power-supply box are separated by removing the screws (2 pieces) on the soldered surface. These two
parts can be replaced as an integrated piece by applying silicon to them.
105

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs-ve12nkeCu-ve9nkeCu-ve12nke

Table of Contents