First Degree Fitness E316 User Manual page 17

Commerical indoor rower
Hide thumbs Also See for E316:
Table of Contents

Advertisement

ASSEMBLY
c) Finish securing the Rear Leg
STEP 8
INSTALL S-BEND AND FRAME TENSIONING BOLT
NOTE:
REQUIRED E316
S-Bend
8
a) Carefully lower the rower to its normal operating position to complete assembly
M10x80mm Bolt
11
2 x M10 Washers
16
M10 Nyloc Nut
17
M10x15mm Bolt
M10 Washer
REQUIRED VX-2
Frame Tension Cable
4
S-Bend
8
M10x40mm Bolt
11
M10x80mm Bolt
14
2 x M10 Nyloc Nut
17
4 x M10 Plastic Washers
19
2 x M10 Washers
20
Bolts
/
and M6 Washers
9
10
E316
M6x20mm Bolt
E316
FOLLOW STEPS A – D.
VX-2
FOLLOW STEPS A,B,E, F AND G
with installation of S-Bend and Frame Tensioning Bolt.
b)
f)
from the inside using the other M6x20mm
7
/
.
14
18
VX-2
c) e)
g)
M6 Washer
M6x20mm Bolt
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vx-2

Table of Contents