Top-Panel Controls And Connections - Fluke Biomedical ESA620 Installation And Getting Started Manual

Electrical safety analyzer
Table of Contents

Advertisement

Item
Name
ECG/Applied Parts
Posts
Nulling Jack
Equipment Outlet
Navigation Buttons
Test Button
Equipment Outlet
Configuration
Buttons
High Voltage
Indicator
Function Softkeys
Test Function
Buttons
Input Jacks
Table 2. Top-Panel Controls and Connections
Connection posts for Device Under Test (DUT) leads, like ECG leads. Used to test for
leakage current through leads and to supply ECG signals and performance waveforms to a
DUT.
Connection for zeroing test lead resistance. Use the probe attached to the test lead to put
into the null jack. Use the null post adapter when you use the alligator clip attached to the
test lead.
Equipment outlet, specific to the version of the Analyzer, which provides a DUT connection.
Cursor control buttons for navigating menus and lists.
Initiates selected tests.
Controls the wiring of the equipment outlet. Opens and closes the neutral and ground
connection and reverses the polarity of the neutral and hot connection.
Indicates when high voltage is applied to the ECG/Applied Parts posts or L1 and L2 of the
Test Receptacle.
Keys F1 through F5 are used to select from a number of selections that appear in the LCD
display above each function softkey.
Selects the various Analyzer test functions.
Test lead connectors.
Electrical Safety Analyzer
Instrument Familiarization
Description
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents