Installation; Pre-Installation - ITT Goulds Pumps API 3171 Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

Installation

Installation

Pre-installation

Precautions
WARNING:
NOTICE:
• Electrical connections must be made by certified electricians in compliance with all
• Supervision by an authorized ITT representative is recommended to ensure proper
Inspect the pump
1. Remove the plastic shipping plugs from the vent holes in the head column and the casing.
2. Remove all the equipment from the shipping containers.
3. Completely clean the underside of the support plate and both sides of the optional pit
4. Remove any grease from the machined surfaces.
Model API 3171 Installation, Operation, and Maintenance Manual
When installing in a potentially explosive environment, ensure that the motor is
properly certified.
All equipment being installed must be properly grounded to prevent unexpected
discharge. Discharge can cause equipment damage, electric shock, and result in serious
injury. Test the ground lead to verify it is connected correctly.
international, national, state and local regulations.
installation. Improper installation may result in equipment damage or decreased perfor-
mance.
"A" represents the location of the plugs
Figure 7: Pump plug locations
cover, if supplied.
Installation
17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Goulds Pumps API 3171 and is the answer not in the manual?

Table of Contents