Site preparation overview

Site preparation overview
Installation time
2
Customers have the option to install the instrument themselves or purchase
installation service from the field services team.
Note: Optional installation by a Thermo Fisher Scientific service representative
includes some basic operator training and a review of data during installation. If you
opt for a service representative to install the instrument, contact Thermo Fisher
Scientific to schedule the installation.
IMPORTANT! Thermo Fisher Scientific does not install, service, or repair instruments
in areas designated BioSafety Level 3 (BSL-3) or BioSafety Level 4 (BSL-4).
Before installing the instrument:
1. Review this guide.
2. Receive and inspect the shipment (page 13).
3. Ensure that the purchase order is complete.
4. Move the packaged instrument to the installation site (page 13).
5. Complete the site preparation checklist (page 3).
This task is required for a service representative to complete the installation.
After the instrument is unpacked, installation and verification take approximately
1 hour. For additional information, see the user documents that are provided with the
instrument.
QuantStudio
3 and 5 Real-Time PCR Systems Site Preparation Guide | MAN0010405 C.0