Receive and inspect the shipment

Move the instrument packages to the installation site

QuantStudio
3 and 5 Real-Time PCR Systems Site Preparation Guide | MAN0010405 C.0
1. Verify that the items on the shipping list are the same items that you ordered at
the time of purchase.
2. Carefully inspect the shipping containers. Report any damage to customer
support. Record any damage or mishandling on the shipping documents.
3. Unpack and store the reagents and plates as specified.
1. Clear the installation site of all unnecessary materials.
2. Move the instrument packages and other shipping containers to the installation
site.
CAUTION! Do not tip the packaged instrument on end. Tipping may
damage the instrument hardware and electronics.
3. Follow the pre-printed instructions on the instrument packaging to install the
instrument.
CAUTION! PHYSICAL INJURY HAZARD. Do not attempt to lift or move the
instrument without the assistance of others, the use of appropriate moving
equipment, and proper lifting techniques.
Improper lifting can cause painful and permanent back injury. Depending on
the weight, moving or lifting an instrument may require two or more people.
Note: After installation, keep the instrument packaging in case you need to relocate
the instrument.