Download Print this page

Set-Up - Yetter 8500 SERIES Owner's Manual

Head cart

Advertisement

Tires and Wheels
1. Using a safe lifting device and jack stands rated at a minimum of 2500 lbs, raise
the frame at least 16 ½" high
2. Install wheels and tires onto the axles and secure with provided lug nuts. Refer to
the table below for torque sequence and value.
• Start all lug nuts by hand to prevent cross threading
• Tighten nuts in the sequence shown below
• Lug nuts should be torqued before first road use and after each wheel
removal. Check and re-torque after the first 50 miles. A periodic check
during regular service is recommended.
Wheel Size
14.5 X 7
10
SET UP INSTRUCTIONS
6
8
4
st
Stud Size
1
9/16"
25 lb-ft
1
3
6.5" BC
5
2
nd
Stage
2
Stage
70 lb-ft
7
rd
3
Stage
130 lb-ft

Advertisement

loading

This manual is also suitable for:

8500-0278500-0328500-0388500-0438500-048