Step 6: Main Gas Shut-Off Valve Train; Step 7: Process Temperature Control System - Eclipse ThermJet TJ0015 - 2000 Technical Information

Version 2
Table of Contents

Advertisement

Air Pressure Switch
The air pressure switch gives a signal to the monitoring
system when there is not enough air pressure from the
blower. You can find more information on pressure
switches in Blower Bulletin 610.
■ Eclipse supports NFPA and EN regulations, which
require the use of an air pressure switch in
conjunction with other safety components, as a
minimum standard for main gas safety shut-off
systems.

Step 6: Main Gas Shut-Off Valve Train

Consult Eclipse
Eclipse can help you design and obtain a main gas shut-
off valve train that complies with the current safety
standards.
The shut-off valve train must comply with all the local
safety standards set by the authorities that have
jurisdiction.
For
details,
please
representative or Eclipse.
NOTE: Eclipse supports NFPA regulations (two shut-off
valves) as a minimum standard for main gas safety shut-
off systems.
Step 7: Process Temperature Control
System
The process temperature control system is used to control
and monitor the temperature of the system. There is a
wide variety of control and measuring equipment
available.
For details, please contact your Eclipse representative or
the Eclipse family.
ThermJet, V2, Technical Information, Edition 2.14
WARNING
contact
your
local
Eclipse
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents