Toyotomi FR-700F Installation And Operation Instructions Manual page 18

Vented heating system
Table of Contents

Advertisement

1. For the standard installation, use the template
sup-plied to position the hole for the flue pipe correctly.
Fig. 1
Comment: The heater must be installed on a strong
and stable floor. The floor must be flat and level. If this
is not the case, the heater can be levelled by means of
adjustable legs. This can be checked with the plumb
line.
2. Drill the hole for the flue pipe. Use a hole saw with a
diameter of 70~80 mm (see Fig. 2). The opening on the
interior side of the wall must be a little higher than the
opening on the outside in order to create a slight
gradient in the feed-through and flue pipe after
Fig. 2
17
Use cellotape or small nails to attach the template to
the desired position on the wall (see Fig. 1).
installation (approximately 2˚) (see Fig. 3). This ensures
that condensed water in the flue pipe flows to the
outside and prevents the penetration of rainwa-ter and
snow after installation.
70 mm - 80 mm
Fig. 3
Tape

Advertisement

Table of Contents
loading

Table of Contents