CEM Razor Installation And Operation Instructions Manual page 4

Parallel cleavage system
Hide thumbs Also See for Razor:
Table of Contents

Advertisement

Hardware Assembly and Setup
1.
Remove the Razor from it's shipping box and place the system in a well ventilated fume hood.
2.
Connect the power cord to the power supply box. Attach the power supply to the connector on the rear of the
system, and plug the power cord into an appropriate outlet.
3.
Attach the two tubes on one end of the waste tubing bundle to the GL45 cap. It does not matter which tube is
connected to which hole. Secure the cap to the 1 L bottle.
4.
Connect the labeled waste cap assembly tubes to the vacuum and vent ports on the side of the system.
WARNING
The Razor should be installed in a ventilated fume hood.
Razor™ Parallel Peptide Cleavage System
600850 • Revision 2 • July 2017
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Razor and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents