SERIES 4 & SERIES 5 12 O’CLOCK CABINET Installation Instructions INTRODUCTION BEFORE YOU BEGIN TABLE OF CONTENTS Overview Study the overview and dimensional specifications. Make sure the planned location will have the necessary space available for installation, including room for all of the operatory equipment.
SERIES 4 & SERIES 5 12 O’CLOCK CABINET Installation Instructions SITE PREPARATION FIRST STEPS Lay the installation template over plumbing stub-ups and check the position in the operatory. Install air and water shut-off valves (not supplied). Install 4 x 4 electrical connection box.
SERIES 4 & SERIES 5 12 O’CLOCK CABINET Installation Instructions INSTALLATION PREPARATIONS Remove cabinet modules from their packaging. Identify the hardware kits and provided literature. WALL HANGING RAIL For cabinets which include a Support Wall, skip to the next page.
Page 7
SERIES 4 & SERIES 5 12 O’CLOCK CABINET Installation Instructions INSTALLATION SUPPORT WALL & LOWER CABINET For cabinets with a Support Wall Position the Support Wall in its final location in the installation area and align the back face of the Lower Cabinet to it.
Page 8
SERIES 4 & SERIES 5 12 O’CLOCK CABINET Installation Instructions INSTALLATION INSTALLING THE CHASE Remove the front panel from the Chase. Center the Chase on the counter of the Lower Module. If mounting to a wall, drill and screw the back of the chase to the wall studs using the screws provided.
SERIES 4 & SERIES 5 12 O’CLOCK CABINET Installation Instructions DOOR AND DRAWER ALIGNMENTS ALIGN DRAWERS Align drawer faces and seams by adjusting the drawer face attachment. ALIGN DOORS Align door faces and seams by adjusting the hinges.
SERIES 4 & SERIES 5 12 O’CLOCK CABINET Installation Instructions ELECTRICAL OUTLETS (SERIES 5 ONLY) DIAGRAM BLACK WIRE - CONNECT TO NEGATIVE CONTACTS GREEN WIRE - CONNECT TO MAINS GROUND WHITE WIRE - CONNECT TO POSITIVE CONTACTS GROUNDING INSTRUCTIONS This product must be connected to a grounded metal, permanent wiring system, or an equipment-grounding conductor must be run with the circuit conductors and connected to the equipment-grounding terminal or lead on the product.
Page 11
DCI International, LLC 305 N. Springbrook Road Newberg, OR 97132, USA PN 67017, Rev. A, 2018-09-14...